The Gympie Memorial Laneway was a large project spanning 1999 – 2015 in collaboration with Jamie MacLean and included 9 panels of hand made ceramic tiles. Each panel was approximately 4 meters wide by 1.8 meters high and took up to 18 months to fabricate.